Shenton Theatre
Architecture | McGlashan Everist
Low-cost conversion of a neglected 1937 Methodist church into a 143-seat recital centre and performance venue for school productions, concerts and community use. Jordan’s responsibilities included developing existing site conditions and sectional studies to test seat layout, tier sizing, sight-lines and clearances, as well as the preparation of all architectural drawings across each stage of the project.